Police Security Dover 1000 Lumen Rechargeable Flashlight  USB-C Charging Cable Included, Slide Focus, 6-Hour Runtime, Impact Resistant  w/Belt Clip.

POLICE SECURITY

Police Security Dover 1000 Lumen Rechargeable Flashlight USB-C Charging Cable Included, Slide Focus, 6-Hour Runtime, Impact Resistant w/Belt Clip.

CA$136.69 CA$227.82
  • Order within to get between
  • Tracked Shipping on All Orders
  • 14-Day Returns
  • Secure Payments
  • 24/7 Customer Support

Description

  • Ultra-Bright Performance: Delivers a powerful 1000 lumens with a beam distance of up to 210 metersideal for mechanics, automotive work, and emergency situations.
  • Long-Lasting & Rechargeable: Equipped with a high-capacity 18650 2600mAh lithium-ion battery for up to 6 hours of runtime on Low mode. Rechargeable via included USB-C cable.
  • Versatile Lighting Modes: Features 3 adaptable settingsHigh (1000 lm), Low (250 lm), and Flashfor various lighting needs, plus Slide Focus for adjustable beam control.
  • Durable & Portable: Impact resistant with a compact 6.65" body and integrated belt clip for easy everyday carry. Built to handle tough work environments.
  • No stand alone batteries are sold with this product


Police Securitys Dover rechargeable, 800 lumen LED flashlight, is optimal for automotive technicians and other professionals who demand long-term flashlight performance. With our Quik Connect USB charging system (cable included), this light functions with a 18650 rechargeable lithium-ion battery delivering up to 11 hours runtime. With high, low, flash modes and slide focus, this flashlight is immediately adaptable to a variety of situations.

Shipping and Returns

  • We offer tracked shipping on all orders. Tracking information will be shared as soon as the order is dispatched.
  • Please check the delivery estimate before adding a product to the cart. This is displayed for every product on the website.
  • Available shipping methods and charges will be displayed at the time of checkout, depending on your exact location.
  • All customers are entitled to a return window of 14 days, starting from the date of delivery of the product(s).
  • Customers are advised to read our return policy for details of the return process, eligibility, refunds as well as cancellations or exchanges.
  • In case of any issues or concerns about Shipping or Returns, please contact us and we will be happy to help.
Police Security Dover 1000 Lumen Rechargeable Flashlight  USB-C Charging Cable Included, Slide Focus, 6-Hour Runtime, Impact Resistant  w/Belt Clip.

Police Security.

Police Security Dover 1000 Lumen Rechargeable Flashlight ...

CA$136.69 CA$227.82